click on a link to see their detailed plans
:: From the Instructor
Objective: Replace the carpet and bathroom tile with new flooring.
Painting Team
Objective: Repaint the majority of the interior walls.
Objective: Install fans and lighting fixtures to increase circulation and add lighting.
Shelving Team
Objective: Provide more accessible rolling shelves in the bedroom, kitchen, and garage.
Objective: Do a complete renovation of the bathrooms. Including a wheelchair accessible shower and sink.