  Flooring Team

Objective: Replace the carpet and bathroom tile with new flooring.

Painting Team

Objective:  Repaint the majority of the interior walls.

  Electric Team

Objective: Install fans and lighting fixtures to increase circulation and add lighting.

Shelving Team

Objective:  Provide more accessible rolling shelves in the bedroom, kitchen, and garage.

  Bathroom Team

Objective:  Do a complete renovation of the bathrooms.  Including a wheelchair accessible shower and sink.

 
 